Peel Harbour Lights

Peel  Scenic view 2005

Peel Harbour 2004
Not to Scale


Breakwater Light 2002
Breakwater Light (Oc 7 sec)
Fog Signal Bell discontinued
mid 1990's

.

Rear Leading light on Pumping Station cupola 2005
Rear Leading light on Pumping Station cupola
(FL R 5 sec) Peel Groyne Light 2004
Groyne Light (FL R 5 sec)
From 8/8/05 used as Front Leading Light with synchronised Rear Leading Light on cupola of drainage pumping station on promenade

Breakwater Light
Fog Bell (4) 14 sec.when vessels expected
Discontinued mid-1990's
Peel Inner Harbour Entrance

Peel Inner Harbour Entrance 2002
Pier Head Light________________________Castle Jetty Light

Peel Pier Head Light 2002 _________________ Castle Jetty Light 2004
Pier Head Light (Lt.Oc.R 7sec)__________________ Castle Jetty Light (Lt.Oc.G 7sec)


Peel Harbour now has a water retention scheme in operation and entry/exit is indicated by Vessel Traffic Lights

Water Retention scheme 2005
Scheme consists of a movable vertical flap and a rotating pedestrian bridge

Water Retention scheme-front 2005
View from sea

Water Retention scheme-rear 2005
View from inside harbour


All photographs Copyright Fred Fox.